| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
1 | AN ACT concerning State government.
| |||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||||
4 | Section 5. The Illinois Finance Authority Act is amended by | |||||||||||||||||||||
5 | changing Section 825-65 as follows:
| |||||||||||||||||||||
6 | (20 ILCS 3501/825-65) | |||||||||||||||||||||
7 | Sec. 825-65. Clean Coal, Coal, Energy Efficiency, and | |||||||||||||||||||||
8 | Renewable Energy Project Financing. | |||||||||||||||||||||
9 | (a) Findings and declaration of policy. | |||||||||||||||||||||
10 | (i) It is hereby found and declared that
Illinois has | |||||||||||||||||||||
11 | abundant coal resources and, in some areas of Illinois, the | |||||||||||||||||||||
12 | demand
for power exceeds the generating capacity. | |||||||||||||||||||||
13 | Incentives to encourage the
construction of coal-fueled | |||||||||||||||||||||
14 | electric generating plants in Illinois to ensure
power | |||||||||||||||||||||
15 | generating capacity into the future and to advance clean | |||||||||||||||||||||
16 | coal technology and the use of Illinois coal are in the | |||||||||||||||||||||
17 | best interests of all of
the citizens of Illinois. | |||||||||||||||||||||
18 | (ii) It is further found and declared that Illinois has | |||||||||||||||||||||
19 | abundant potential and resources to develop renewable | |||||||||||||||||||||
20 | energy resource projects and that there are many | |||||||||||||||||||||
21 | opportunities to invest in cost-effective energy | |||||||||||||||||||||
22 | efficiency projects throughout the State. The development | |||||||||||||||||||||
23 | of those projects will create jobs and investment as well |
| |||||||
| |||||||
1 | as decrease environmental impacts and promote energy | ||||||
2 | independence in Illinois. Accordingly, the development of | ||||||
3 | those projects is in the best interests of all of the | ||||||
4 | citizens of Illinois. | ||||||
5 | (iii) The Authority is authorized to issue bonds to | ||||||
6 | help
finance Clean Coal, Coal, Energy Efficiency, and | ||||||
7 | Renewable Energy projects pursuant to this
Section. | ||||||
8 | (b) Definitions. | ||||||
9 | (i) "Clean Coal Project" means (A) "clean coal | ||||||
10 | facility", as defined in Section 1-10 of the Illinois Power | ||||||
11 | Agency Act; (B) "clean coal SNG facility", as defined in | ||||||
12 | Section 1-10 of the Illinois Power Agency Act; (C) | ||||||
13 | transmission lines and associated equipment that transfer | ||||||
14 | electricity from points of supply to points of delivery for | ||||||
15 | projects described in this subsection (b); (D) pipelines or | ||||||
16 | other methods to transfer carbon dioxide from the point of | ||||||
17 | production to the point of storage or sequestration for | ||||||
18 | projects described in this subsection (b); or (E) projects | ||||||
19 | to provide carbon abatement technology for existing | ||||||
20 | generating facilities. | ||||||
21 | (ii) "Coal Project" means new electric
generating | ||||||
22 | facilities or new gasification facilities, as defined in
| ||||||
23 | Section 605-332 of the Department of Commerce and
Economic | ||||||
24 | Opportunity Law of the Civil Administrative Code of | ||||||
25 | Illinois, which
may
include mine-mouth power plants, | ||||||
26 | projects that employ the use of clean coal
technology, |
| |||||||
| |||||||
1 | projects to provide scrubber technology for existing | ||||||
2 | energy
generating plants, or projects to provide electric | ||||||
3 | transmission facilities or new gasification facilities. | ||||||
4 | (iii) "Energy Efficiency Project" means measures that | ||||||
5 | reduce the amount of electricity or natural gas required to | ||||||
6 | achieve a given end use, consistent with Section 1-10 of | ||||||
7 | the Illinois Power Agency Act. "Energy Efficiency Project" | ||||||
8 | also includes measures that reduce the total Btus of | ||||||
9 | electricity and natural gas needed to meet the end use or | ||||||
10 | uses and measures that decrease the heat rate in the | ||||||
11 | generation of electricity consistent with Section 1-10 of | ||||||
12 | the Illinois Power Agency Act. | ||||||
13 | (iv) "Renewable Energy Project" means (A) a project | ||||||
14 | that uses renewable energy resources, as defined in Section | ||||||
15 | 1-10 of the Illinois Power Agency Act; (B) a project that | ||||||
16 | uses environmentally preferable technologies and practices | ||||||
17 | that result in improvements to the production of renewable | ||||||
18 | fuels, including but not limited to, cellulosic | ||||||
19 | conversion, water and energy conservation, fractionation, | ||||||
20 | alternative feedstocks, or reduced green house gas | ||||||
21 | emissions; (C) transmission lines and associated equipment | ||||||
22 | that transfer electricity from points of supply to points | ||||||
23 | of delivery for projects described in this subsection (b); | ||||||
24 | or (D) projects that use technology for the storage of | ||||||
25 | renewable energy, including, without limitation, the use | ||||||
26 | of battery or electrochemical storage technology for |
| |||||||
| |||||||
1 | mobile or stationary applications. | ||||||
2 | (c) Creation of reserve funds. The Authority may establish | ||||||
3 | and maintain one
or more reserve funds to enhance bonds issued | ||||||
4 | by the Authority for a Clean Coal Project, a Coal Project, an | ||||||
5 | Energy Efficiency Project, or a Renewable
Energy Project.
There | ||||||
6 | may be one or more accounts in these reserve funds in which | ||||||
7 | there may be
deposited: | ||||||
8 | (1) any proceeds of the bonds issued by the Authority | ||||||
9 | required to
be deposited therein by the terms of any | ||||||
10 | contract between the Authority and its
bondholders or any | ||||||
11 | resolution of the Authority; | ||||||
12 | (2) any other moneys or funds of the Authority that it | ||||||
13 | may
determine to deposit therein from any other source; and | ||||||
14 | (3) any other moneys or funds made available to the | ||||||
15 | Authority.
Subject to the terms of any pledge to the owners | ||||||
16 | of any bonds, moneys in any
reserve fund may be held and | ||||||
17 | applied to the payment of principal, premium, if
any, and | ||||||
18 | interest of such bonds. | ||||||
19 | (d) Powers and duties. The Authority has the power: | ||||||
20 | (1) To issue bonds in one or more series pursuant to | ||||||
21 | one or more
resolutions of the Authority for any Clean Coal | ||||||
22 | Project, Coal Project, Energy Efficiency Project, or | ||||||
23 | Renewable Energy Project authorized
under this Section, | ||||||
24 | within the authorization set forth in subsection (e). | ||||||
25 | (2) To provide for the funding of any reserves or other | ||||||
26 | funds or
accounts deemed necessary by the Authority in |
| |||||||
| |||||||
1 | connection with any bonds issued
by the Authority. | ||||||
2 | (3) To pledge any funds of the Authority or funds made | ||||||
3 | available to
the Authority that may be applied to such | ||||||
4 | purpose as security for any bonds or
any guarantees, | ||||||
5 | letters of credit, insurance contracts or similar credit
| ||||||
6 | support
or liquidity instruments securing the bonds. | ||||||
7 | (4) To enter into agreements or contracts with third | ||||||
8 | parties,
whether public or private, including, without | ||||||
9 | limitation, the United States of
America, the State or any | ||||||
10 | department or agency thereof, to obtain any
| ||||||
11 | appropriations, grants, loans or guarantees that are | ||||||
12 | deemed necessary or
desirable by the Authority. Any such | ||||||
13 | guarantee, agreement or contract may
contain terms and | ||||||
14 | provisions necessary or desirable in connection with the
| ||||||
15 | program, subject to the requirements established by the | ||||||
16 | Act. | ||||||
17 | (5) To exercise such other powers as are necessary or | ||||||
18 | incidental to
the foregoing. | ||||||
19 | (e) Clean Coal Project, Coal Project, Energy Efficiency | ||||||
20 | Project, and Renewable Energy Project bond authorization and | ||||||
21 | financing limits. In
addition
to any other bonds authorized to | ||||||
22 | be issued under
Sections 801-40(w), 825-60, 830-25
and 845-5, | ||||||
23 | the Authority may have outstanding, at any time, bonds for the
| ||||||
24 | purpose
enumerated in this
Section 825-65 in an aggregate | ||||||
25 | principal amount that shall not
exceed $3,000,000,000, subject | ||||||
26 | to the following limitations: (i) up to $300,000,000 may be |
| |||||||
| |||||||
1 | issued to
finance projects, as described in clause (C) of | ||||||
2 | subsection (b)(i) and clause (C) of subsection (b)(iv) of this | ||||||
3 | Section 825-65; (ii) up to $500,000,000 may be issued to
| ||||||
4 | finance projects, as described in clauses (D) and (E) of | ||||||
5 | subsection (b)(i) of this Section 825-65; (iii) up to | ||||||
6 | $2,000,000,000 may
be issued to finance Clean Coal Projects, as | ||||||
7 | described in clauses (A) and (B) of subsection (b)(i) of this | ||||||
8 | Section 825-65 and Coal Projects, as described in subsection | ||||||
9 | (b)(ii) of this Section 825-65; and (iv) up to $2,000,000,000 | ||||||
10 | may be issued to finance Energy Efficiency Projects, as | ||||||
11 | described in subsection (b)(iii) of this Section 825-65 and | ||||||
12 | Renewable Energy Projects, as described in clauses (A), (B), | ||||||
13 | and (D) of subsection (b)(iii) of this Section 825-65. An | ||||||
14 | application for a loan
financed from bond proceeds from a | ||||||
15 | borrower or its affiliates for a Clean Coal Project, a Coal | ||||||
16 | Project, Energy Efficiency Project, or a Renewable
Energy | ||||||
17 | Project may not be approved by the Authority for an amount in | ||||||
18 | excess
of $450,000,000 for any borrower or its affiliates. A | ||||||
19 | Clean Coal Project or Coal Project must be located within the | ||||||
20 | State. An Energy Efficiency Project may be located within the | ||||||
21 | State or outside the State, provided that, if the Energy | ||||||
22 | Efficiency Project is located outside of the State, it must be | ||||||
23 | owned, operated, leased, or managed by an entity located within | ||||||
24 | the State or any entity affiliated with an entity located | ||||||
25 | within the State. These bonds shall not
constitute an | ||||||
26 | indebtedness or obligation of the State of Illinois and it |
| |||||||
| |||||||
1 | shall
be plainly stated on the face of each bond that it does | ||||||
2 | not constitute an
indebtedness or obligation of the State of | ||||||
3 | Illinois, but is payable solely from
the revenues, income or | ||||||
4 | other assets of the Authority pledged therefor. | ||||||
5 | (f) The bonding authority granted under this Section is in | ||||||
6 | addition to and not limited by the provisions of Section 845-5. | ||||||
7 | (Source: P.A. 98-90, eff. 7-15-13.)
| ||||||
8 | Section 10. The Illinois Power Agency Act is amended by | ||||||
9 | changing Section 1-10 as follows:
| ||||||
10 | (20 ILCS 3855/1-10)
| ||||||
11 | Sec. 1-10. Definitions. | ||||||
12 | "Agency" means the Illinois Power Agency. | ||||||
13 | "Agency loan agreement" means any agreement pursuant to | ||||||
14 | which the Illinois Finance Authority agrees to loan the | ||||||
15 | proceeds of revenue bonds issued with respect to a project to | ||||||
16 | the Agency upon terms providing for loan repayment installments | ||||||
17 | at least sufficient to pay when due all principal of, interest | ||||||
18 | and premium, if any, on those revenue bonds, and providing for | ||||||
19 | maintenance, insurance, and other matters in respect of the | ||||||
20 | project. | ||||||
21 | "Authority" means the Illinois Finance Authority. | ||||||
22 | "Clean coal facility" means an electric generating | ||||||
23 | facility that uses primarily coal as a feedstock and that | ||||||
24 | captures and sequesters carbon dioxide emissions at the |
| |||||||
| |||||||
1 | following levels: at least 50% of the total carbon dioxide | ||||||
2 | emissions that the facility would otherwise emit if, at the | ||||||
3 | time construction commences, the facility is scheduled to | ||||||
4 | commence operation before 2016, at least 70% of the total | ||||||
5 | carbon dioxide emissions that the facility would otherwise emit | ||||||
6 | if, at the time construction commences, the facility is | ||||||
7 | scheduled to commence operation during 2016 or 2017, and at | ||||||
8 | least 90% of the total carbon dioxide emissions that the | ||||||
9 | facility would otherwise emit if, at the time construction | ||||||
10 | commences, the facility is scheduled to commence operation | ||||||
11 | after 2017. The power block of the clean coal facility shall | ||||||
12 | not exceed allowable emission rates for sulfur dioxide, | ||||||
13 | nitrogen oxides, carbon monoxide, particulates and mercury for | ||||||
14 | a natural gas-fired combined-cycle facility the same size as | ||||||
15 | and in the same location as the clean coal facility at the time | ||||||
16 | the clean coal facility obtains an approved air permit. All | ||||||
17 | coal used by a clean coal facility shall have high volatile | ||||||
18 | bituminous rank and greater than 1.7 pounds of sulfur per | ||||||
19 | million btu content, unless the clean coal facility does not | ||||||
20 | use gasification technology and was operating as a conventional | ||||||
21 | coal-fired electric generating facility on June 1, 2009 (the | ||||||
22 | effective date of Public Act 95-1027). | ||||||
23 | "Clean coal SNG brownfield facility" means a facility that | ||||||
24 | (1) has commenced construction by July 1, 2015 on an urban | ||||||
25 | brownfield site in a municipality with at least 1,000,000 | ||||||
26 | residents; (2) uses a gasification process to produce |
| |||||||
| |||||||
1 | substitute natural gas; (3) uses coal as at least 50% of the | ||||||
2 | total feedstock over the term of any sourcing agreement with a | ||||||
3 | utility and the remainder of the feedstock may be either | ||||||
4 | petroleum coke or coal, with all such coal having a high | ||||||
5 | bituminous rank and greater than 1.7 pounds of sulfur per | ||||||
6 | million Btu content unless the facility reasonably determines
| ||||||
7 | that it is necessary to use additional petroleum coke to
| ||||||
8 | deliver additional consumer savings, in which case the
facility | ||||||
9 | shall use coal for at least 35% of the total
feedstock over the | ||||||
10 | term of any sourcing agreement; and (4) captures and sequesters | ||||||
11 | at least 85% of the total carbon dioxide emissions that the | ||||||
12 | facility would otherwise emit. | ||||||
13 | "Clean coal SNG facility" means a facility that uses a | ||||||
14 | gasification process to produce substitute natural gas, that | ||||||
15 | sequesters at least 90% of the total carbon dioxide emissions | ||||||
16 | that the facility would otherwise emit, that uses at least 90% | ||||||
17 | coal as a feedstock, with all such coal having a high | ||||||
18 | bituminous rank and greater than 1.7 pounds of sulfur per | ||||||
19 | million btu content, and that has a valid and effective permit | ||||||
20 | to construct emission sources and air pollution control | ||||||
21 | equipment and approval with respect to the federal regulations | ||||||
22 | for Prevention of Significant Deterioration of Air Quality | ||||||
23 | (PSD) for the plant pursuant to the federal Clean Air Act; | ||||||
24 | provided, however, a clean coal SNG brownfield facility shall | ||||||
25 | not be a clean coal SNG facility. | ||||||
26 | "Commission" means the Illinois Commerce Commission. |
| |||||||
| |||||||
1 | "Costs incurred in connection with the development and | ||||||
2 | construction of a facility" means: | ||||||
3 | (1) the cost of acquisition of all real property, | ||||||
4 | fixtures, and improvements in connection therewith and | ||||||
5 | equipment, personal property, and other property, rights, | ||||||
6 | and easements acquired that are deemed necessary for the | ||||||
7 | operation and maintenance of the facility; | ||||||
8 | (2) financing costs with respect to bonds, notes, and | ||||||
9 | other evidences of indebtedness of the Agency; | ||||||
10 | (3) all origination, commitment, utilization, | ||||||
11 | facility, placement, underwriting, syndication, credit | ||||||
12 | enhancement, and rating agency fees; | ||||||
13 | (4) engineering, design, procurement, consulting, | ||||||
14 | legal, accounting, title insurance, survey, appraisal, | ||||||
15 | escrow, trustee, collateral agency, interest rate hedging, | ||||||
16 | interest rate swap, capitalized interest, contingency, as | ||||||
17 | required by lenders, and other financing costs, and other | ||||||
18 | expenses for professional services; and | ||||||
19 | (5) the costs of plans, specifications, site study and | ||||||
20 | investigation, installation, surveys, other Agency costs | ||||||
21 | and estimates of costs, and other expenses necessary or | ||||||
22 | incidental to determining the feasibility of any project, | ||||||
23 | together with such other expenses as may be necessary or | ||||||
24 | incidental to the financing, insuring, acquisition, and | ||||||
25 | construction of a specific project and starting up, | ||||||
26 | commissioning, and placing that project in operation. |
| |||||||
| |||||||
1 | "Department" means the Department of Commerce and Economic | ||||||
2 | Opportunity. | ||||||
3 | "Director" means the Director of the Illinois Power Agency. | ||||||
4 | "Demand-response" means measures that decrease peak | ||||||
5 | electricity demand or shift demand from peak to off-peak | ||||||
6 | periods. | ||||||
7 | "Distributed renewable energy generation device" means a | ||||||
8 | device that is: | ||||||
9 | (1) powered by wind, solar thermal energy, | ||||||
10 | photovoltaic cells and panels, biodiesel, crops and | ||||||
11 | untreated and unadulterated organic waste biomass, tree | ||||||
12 | waste, and hydropower that does not involve new | ||||||
13 | construction or significant expansion of hydropower dams; | ||||||
14 | (2) interconnected at the distribution system level of | ||||||
15 | either an electric utility as defined in this Section, an | ||||||
16 | alternative retail electric supplier as defined in Section | ||||||
17 | 16-102 of the Public Utilities Act, a municipal utility as | ||||||
18 | defined in Section 3-105 of the Public Utilities Act, or a | ||||||
19 | rural electric cooperative as defined in Section 3-119 of | ||||||
20 | the Public Utilities Act; | ||||||
21 | (3) located on the customer side of the customer's | ||||||
22 | electric meter and is primarily used to offset that | ||||||
23 | customer's electricity load; and | ||||||
24 | (4) limited in nameplate capacity to no more than 2,000 | ||||||
25 | kilowatts. | ||||||
26 | "Energy efficiency" means measures that reduce the amount |
| |||||||
| |||||||
1 | of electricity or natural gas required to achieve a given end | ||||||
2 | use. "Energy efficiency" also includes measures that reduce the | ||||||
3 | total Btus of electricity and natural gas needed to meet the | ||||||
4 | end use or uses and measures that decrease the heat rate in the | ||||||
5 | generation of electricity . | ||||||
6 | "Electric utility" has the same definition as found in | ||||||
7 | Section 16-102 of the Public Utilities Act. | ||||||
8 | "Facility" means an electric generating unit or a | ||||||
9 | co-generating unit that produces electricity along with | ||||||
10 | related equipment necessary to connect the facility to an | ||||||
11 | electric transmission or distribution system. | ||||||
12 | "Governmental aggregator" means one or more units of local | ||||||
13 | government that individually or collectively procure | ||||||
14 | electricity to serve residential retail electrical loads | ||||||
15 | located within its or their jurisdiction. | ||||||
16 | "Local government" means a unit of local government as | ||||||
17 | defined in Section 1 of Article VII of the Illinois | ||||||
18 | Constitution. | ||||||
19 | "Municipality" means a city, village, or incorporated | ||||||
20 | town. | ||||||
21 | "Person" means any natural person, firm, partnership, | ||||||
22 | corporation, either domestic or foreign, company, association, | ||||||
23 | limited liability company, joint stock company, or association | ||||||
24 | and includes any trustee, receiver, assignee, or personal | ||||||
25 | representative thereof. | ||||||
26 | "Project" means the planning, bidding, and construction of |
| |||||||
| |||||||
1 | a facility. | ||||||
2 | "Public utility" has the same definition as found in | ||||||
3 | Section 3-105 of the Public Utilities Act. | ||||||
4 | "Real property" means any interest in land together with | ||||||
5 | all structures, fixtures, and improvements thereon, including | ||||||
6 | lands under water and riparian rights, any easements, | ||||||
7 | covenants, licenses, leases, rights-of-way, uses, and other | ||||||
8 | interests, together with any liens, judgments, mortgages, or | ||||||
9 | other claims or security interests related to real property. | ||||||
10 | "Renewable energy credit" means a tradable credit that | ||||||
11 | represents the environmental attributes of a certain amount of | ||||||
12 | energy produced from a renewable energy resource. | ||||||
13 | "Renewable energy resources" includes energy and its | ||||||
14 | associated renewable energy credit or renewable energy credits | ||||||
15 | from wind, solar thermal energy, photovoltaic cells and panels, | ||||||
16 | biodiesel, anaerobic digestion, crops and untreated and | ||||||
17 | unadulterated organic waste biomass, tree waste, hydropower | ||||||
18 | that does not involve new construction or significant expansion | ||||||
19 | of hydropower dams, and other alternative sources of | ||||||
20 | environmentally preferable energy. For purposes of this Act, | ||||||
21 | landfill gas produced in the State is considered a renewable | ||||||
22 | energy resource. "Renewable energy resources" does not include | ||||||
23 | the incineration or burning of tires, garbage, general | ||||||
24 | household, institutional, and commercial waste, industrial | ||||||
25 | lunchroom or office waste, landscape waste other than tree | ||||||
26 | waste, railroad crossties, utility poles, or construction or |
| |||||||
| |||||||
1 | demolition debris, other than untreated and unadulterated | ||||||
2 | waste wood. | ||||||
3 | "Revenue bond" means any bond, note, or other evidence of | ||||||
4 | indebtedness issued by the Authority, the principal and | ||||||
5 | interest of which is payable solely from revenues or income | ||||||
6 | derived from any project or activity of the Agency. | ||||||
7 | "Sequester" means permanent storage of carbon dioxide by | ||||||
8 | injecting it into a saline aquifer, a depleted gas reservoir, | ||||||
9 | or an oil reservoir, directly or through an enhanced oil | ||||||
10 | recovery process that may involve intermediate storage, | ||||||
11 | regardless of whether these activities are conducted by a clean | ||||||
12 | coal facility, a clean coal SNG facility, a clean coal SNG | ||||||
13 | brownfield facility, or a party with which a clean coal | ||||||
14 | facility, clean coal SNG facility, or clean coal SNG brownfield | ||||||
15 | facility has contracted for such purposes. | ||||||
16 | "Sourcing agreement" means (i) in the case of an electric | ||||||
17 | utility, an agreement between the owner of a clean coal | ||||||
18 | facility and such electric utility, which agreement shall have | ||||||
19 | terms and conditions meeting the requirements of paragraph (3) | ||||||
20 | of subsection (d) of Section 1-75, (ii) in the case of an | ||||||
21 | alternative retail electric supplier, an agreement between the | ||||||
22 | owner of a clean coal facility and such alternative retail | ||||||
23 | electric supplier, which agreement shall have terms and | ||||||
24 | conditions meeting the requirements of Section 16-115(d)(5) of | ||||||
25 | the Public Utilities Act, and (iii) in case of a gas utility, | ||||||
26 | an agreement between the owner of a clean coal SNG brownfield |
| |||||||
| |||||||
1 | facility and the gas utility, which agreement shall have the | ||||||
2 | terms and conditions meeting the requirements of subsection | ||||||
3 | (h-1) of Section 9-220 of the Public Utilities Act. | ||||||
4 | "Substitute natural gas" or "SNG" means a gas manufactured | ||||||
5 | by gasification of hydrocarbon feedstock, which is | ||||||
6 | substantially interchangeable in use and distribution with | ||||||
7 | conventional natural gas. | ||||||
8 | "Total resource cost test" or "TRC test" means a standard | ||||||
9 | that is met if, for an investment in energy efficiency or | ||||||
10 | demand-response measures, the benefit-cost ratio is greater | ||||||
11 | than one. The benefit-cost ratio is the ratio of the net | ||||||
12 | present value of the total benefits of the program to the net | ||||||
13 | present value of the total costs as calculated over the | ||||||
14 | lifetime of the measures. A total resource cost test compares | ||||||
15 | the sum of avoided electric utility costs, representing the | ||||||
16 | benefits that accrue to the system and the participant in the | ||||||
17 | delivery of those efficiency measures, as well as other | ||||||
18 | quantifiable societal benefits, including avoided natural gas | ||||||
19 | utility costs, to the sum of all incremental costs of end-use | ||||||
20 | measures that are implemented due to the program (including | ||||||
21 | both utility and participant contributions), plus costs to | ||||||
22 | administer, deliver, and evaluate each demand-side program, to | ||||||
23 | quantify the net savings obtained by substituting the | ||||||
24 | demand-side program for supply resources. In calculating | ||||||
25 | avoided costs of power and energy that an electric utility | ||||||
26 | would otherwise have had to acquire, reasonable estimates shall |
| |||||||
| |||||||
1 | be included of financial costs likely to be imposed by future | ||||||
2 | regulations and legislation on emissions of greenhouse gases.
| ||||||
3 | (Source: P.A. 97-96, eff. 7-13-11; 97-239, eff. 8-2-11; 97-491, | ||||||
4 | eff. 8-22-11; 97-616, eff. 10-26-11; 97-813, eff. 7-13-12; | ||||||
5 | 98-90, eff. 7-15-13.)
| ||||||
6 | Section 99. Effective date. This Act takes effect upon | ||||||
7 | becoming law.
|